PLACENTIA
The Orange North American Trade Rail Access Corridor Authority (OnTrac) board of directors has approved an agreement with Fullerton to perform a feasibility study for the Orangethorpe rail-lowering project.
The study will examine a depressed track/trench alternative and the standard grade separation for train tracks at Placentia Avenue, State College Boulevard, Acacia Avenue and Raymond Avenue.
Placentia was designated the lead agency for $28 million by Gov. Gray Davis that will go toward grade separation projects on the Orangethorpe Rail Corridor from the Los Angeles County line to Santa Ana Canyon. Information: Chris Becker at (714)993-8245.
More to Read
Sign up for Essential California
The most important California stories and recommendations in your inbox every morning.
You may occasionally receive promotional content from the Los Angeles Times.