Advertisement

SEAL BEACH

Share via

Installation of a high-pressure gas main line by Southern California Gas Co. on Seal Beach Boulevard will require lane closures beginning Monday.

Motorists can expect slowed traffic on southbound lanes of Seal Beach Boulevard between Beverly Manor Road and Adolfo Lopez Drive through late August. Also, the construction of 14-foot-wide medians on Seal Beach Boulevard between Bolsa Avenue and Adolfo Lopez Drive is expected to be complete by the end of July. Street project information is available by calling the deputy city engineer at (562) 431-2527, Ext. 322.

Advertisement