Texas Train Fast as a Speeding Bullet
- Share via
Facts about the proposed Texas bullet train:
ROUTE: The first two legs would run between Houston and Dallas, and San Antonio and Dallas. A third leg, connecting San Antonio and Houston, has been discussed.
COST: Estimates for all three legs range from $5.5 billion to $6 billion.
BUILDERS: A group of American and French investors led by Morrison Knudsen Corp. of Idaho. The group used to be called Texas TGV, but has changed its name to the Texas High-Speed Rail Corp. The state agency in charge of overseeing the project is the Texas High-Speed Rail Authority.
FARES: The builders say they would be comparable to airline fares.
TIMETABLE: Service from Houston to Dallas, with stops at Dallas-Ft. Worth International Airport and Ft. Worth, must start by the end of 1998. The San Antonio-Austin-Dallas leg must start by the end of 1999.
SPEED: Normal cruising speed would be 200 m.p.h. Speeds would be reduced in cities. The trip from Houston to Dallas would take 1 1/2 hours; the trip from San Antonio to Dallas, one hour and 44 minutes. Both trips take about five hours to drive.
More to Read
Sign up for The Wild
We’ll help you find the best places to hike, bike and run, as well as the perfect silent spots for meditation and yoga.
You may occasionally receive promotional content from the Los Angeles Times.